Bidart Stockdale Digester, California Bioenergy, LLC, Kern County, California

This project consisted of a 600 kW (expandable to 800 kW) peak electrical generating facility powered by biogas collected from a dairy manure anaerobic digester. Project tasks included field investigations, design, construction document preparation, permitting, and funding assistance. Provost & Pritchard was responsible for design of the effluent pump station, manure solid separator infrastructure, sand and grit separator, effluent piping, biogas piping, generator building and gas treatment area, biogas relief vent stack, digester lining system and Regional Water Quality Control Board permitting and construction quality assurance.