Surveying

Gill Ranch Gas Storage & Pipeline, Gill Ranch Storage, Fresno & Madera Counties, California

Provost & Pritchard was the prime land surveying consultant for the Gill Ranch Storage Project, a 27-mile natural gas transmission pipeline and interconnection constructed in western Fresno and Madera counties. Project tasks included preliminary planning of surveys needed to facilitate design of the new facilities, a fast-static GPS control survey, topographic data collection for use by design engineers, right of way and boundary determination, document preparation, construction staking, and as-build data collection for documentation purposes. In addition, survey control monumentation, document recordation, and pipeline as-built data collection/documentation was provided for accuracy and reliability for any future maintenance, upgrades, and expansion needed on the project.

Surveying Projects
Gill Ranch Gas Storage & Pipeline
Yosemite Institute Environmental Education Campus
Visalia Recreation Park Improvements
Arvin-Edison Water Storage District South Canal